It is important that you contact a United Power project coordinator and complete the appropriate application prior to the date that you desire connection of electric service to ensure that your project is not delayed. If you are unsure whether your project will require a United Power application, please contact the project coordinator for your service area. Please fill out as much information as possible on the application below, including: Service size Information in all required* fields All available information in addition to required fields Project documents required (as available per project): Site Plan Utility Plan (with existing and proposed) Utilities/Facilities (when available) Landscape Plan (when available) Electric Meter(s) Location Electric Transformer(s) Location (when available) Approved Recorded Plat Phase Map (if applicable) Approved Construction Drawings Approved Streetlight Locations & Type of Streetlights